NASA Names Eight Firms for $10 Billion Moon Base Cargo Contract
NASA has named eight American companies to compete for up to $10 billion in cargo deliveries to the Moon, unveiling the commercial backbone of its planned permanent base at the lunar South Pole.
The agency announced the package on Saturday, 7 November, at the MAX POWER aerospace expo at Kennedy Space Center in Florida, alongside a nuclear-powered rover and new launch and transport orders. Full details are in NASA’s announcement, with further reporting in NASASpaceFlight’s analysis of the package.
What the $10 billion actually buys
The headline figure is the combined ceiling of a new framework called Commercial Lunar Payload Services 2, or CLPS 2 — not money already handed to any company. Under the 10-year, multiple-award contract, eight firms are eligible to bid for individual delivery jobs as they arise: Blue Origin, Firefly Aerospace, Intuitive Machines, ispace-U.S., Lockheed Martin Space, Northrop Grumman Space Systems, SpaceX and Voyager Technologies.
Each firm is guaranteed only $25,000 under its base contract. Real money will flow through later task orders, none of which has been announced yet, and the $10 billion is the maximum NASA could spend across all eight companies over the decade. The base ordering period runs through September 2036, with a five-year option lifting the ceiling to $15 billion.
NASA also raised the ceiling on its existing CLPS 1.0 contract from $2.6 billion to $4.2 billion. That framework stays in place through November 2028. The plan fits the White House’s push for a permanent lunar presence: President Trump has pledged a return to the Moon by 2028, and NASA opened applications for its next class of astronauts.
PROMISE: a nuclear rover built from Mars parts
The most striking single project is PROMISE — the Polar Rover for Observation, Mapping, and In-Situ Exploration. The six-wheeled, nuclear-powered rover will land at the South Pole to map the surface and subsurface, assess resources, and help NASA choose landing sites. Nuclear power lets it work through long lunar nights and inside shadowed craters thought to harbour water ice.
NASA’s Jet Propulsion Laboratory will build the rover from spare flight hardware and engineering test models left over from the Curiosity and Perseverance Mars rovers — a shortcut the agency says cuts cost and shortens the schedule. Its instruments include a drill to sample regolith a metre down, spectrometers, temperature and radiation sensors, and cameras.
Blue Origin has won the only concrete payday of the day so far: a $94 million base contract, with a further $140 million available on performance, to deliver PROMISE aboard its Mark 1 lander. Launch is targeted for late 2028, for a planned 18-month mission.
The freight network: rockets, tugs and drones
Getting cargo to the Moon needs more than landers. NASA awarded six task orders worth about $1.3 billion combined under its Venture-Class Acquisition of Dedicated and Rideshare (VADR) contract, to Arrow Science and Technology, Blue Origin and Impulse Space, to integrate and transport Moon Base cargo.
The missions will prove communications, navigation and orbital-transfer capability, including a CAPSTONE 02 flight; send MoonFall drones to survey the South Pole before astronauts arrive; and test navigation in multiple cislunar orbits. Some will launch aboard Blue Origin’s New Glenn rocket, Relativity Space’s Terran R and SpaceX’s Falcon 9.
Separately, SpaceX was selected to launch communications satellites aboard its Starship rocket into cislunar space in 2028, to test the lunar communications networks that will keep astronauts and mission control connected.
Power and communications for the base
NASA also awarded the first hardware for a Mini-Communications and Solar Tower, known as miniCAST, which will combine power and communications. Honeybee Robotics, a Blue Origin company, will provide energy storage; Redwire will handle power generation; and Yank Technologies will supply wireless power-transfer hardware. Engineers at NASA’s Marshall Space Flight Center will assemble and test the systems, and work is expected to begin within months.
Why the South Pole, and what comes next
The South Pole matters because of water. Ice trapped in shadowed craters could be turned into drinking water, breathable oxygen and even rocket propellant — the difference between a base that must be supplied from Earth and one that can sustain itself.
NASA said in October that the first element of the base is due to launch in December, with robotic missions following almost monthly from early 2027. Schedules have often slipped, and the $10 billion ceiling will only be approached if NASA orders enough missions. But Saturday’s package is the clearest signal yet that the Moon Base is moving from planning documents to purchase orders.
“We are building the Moon Base mission by mission,” said NASA Administrator Jared Isaacman. “When our astronauts return to the Moon, they will arrive with the first elements of the Moon Base already waiting for them on the surface.”